Complete Home Renovation & Extension
Location: Surbiton, KT6
This residential renovation and extension project in Surbiton transformed a traditional three-bedroom property into a spacious, modern family home designed for contemporary living.
The project included an 8m x 6m rear and side extension alongside a complete strip-out of the existing property, creating the opportunity to reconfigure the layout and maximise living space throughout the home. Dynamic Engineering Group delivered a comprehensive package of works, including full electrical rewiring, new plumbing installations, plastering, face brickwork, pointing, and external patio construction.
Internally, the refurbishment featured a new kitchen, utility room, and downstairs WC, complemented by intelligent lighting systems and wet underfloor heating to enhance both comfort and energy efficiency. Careful attention was given to every detail, ensuring a high-quality finish that combined practicality with modern design.
From structural alterations through to final finishes, the project demonstrates our ability to deliver complete residential renovation and extension solutions while maintaining quality, craftsmanship, and attention to detail throughout every stage of the build.
Bathrooms & Kitchen Remodel
Location: Littlehampton, BN17
This full home refurbishment transformed the property's kitchen, main bathroom, ensuite shower room, and downstairs WC into modern, functional spaces finished to a high specification.
The kitchen was completely stripped back and redesigned with new cabinetry, flooring, and integrated LED under-unit and cabinet lighting, creating a contemporary and practical living space. The main bathroom and ensuite were fully renovated to include spacious walk-in showers with overhead rainfall shower systems, recessed wall niches, wall-hung sanitaryware, and integrated sensor lighting for a sleek, modern finish.
New tiling and flooring were installed throughout all bathroom areas, while the downstairs WC received a stylish upgrade with new sanitaryware and finishes to complement the rest of the home.
The completed project showcases how thoughtful design, quality materials, and attention to detail can transform everyday spaces into luxurious and functional environments.
Electrical Refurbishment & Project Recovery
Location: Chiswick, W4
This residential refurbishment project in Chiswick involved the completion and rectification of electrical works after the original contractor failed to deliver the installation to the required standard.
Dynamic Engineering Group Ltd was appointed to assess, test, and complete the electrical installation, ensuring the property was safe, compliant, and ready for occupation. Our team carried out comprehensive electrical testing of the existing first-fix wiring, identifying and rectifying any issues before proceeding with a full house rewire where required, alongside the installation of a new consumer unit and upgraded electrical infrastructure throughout the property.
The project featured a range of high-end lighting installations designed to enhance both the functionality and appearance of the home. These included integrated staircase up-lights, bespoke kitchen cabinetry lighting, pendant lighting above the kitchen island, and a statement chandelier positioned within the central atrium, creating a striking focal point within the property.
Through careful testing, fault finding, and coordinated installation works, we successfully transformed an incomplete project into a fully functioning electrical system finished to a high standard. The completed refurbishment highlights our ability to take over challenging projects, resolve technical issues, and deliver quality electrical installations with attention to detail throughout.
Barbers Shop Electrical Design & Fit-Out
Location: Redhill, RH1
This commercial fit-out project in Redhill involved the complete electrical design and rewiring of a modern barbers shop, creating a stylish and functional environment for both customers and staff.
Dynamic Engineering Group Ltd was appointed to design and install the electrical systems throughout the premises, ensuring the layout and lighting complemented the shop's contemporary interior while providing the practical lighting levels required for daily operations. Particular attention was given to the lighting design, combining task lighting and feature lighting to create a welcoming and professional atmosphere.
The project featured a carefully selected mix of recessed spotlights and industrial-style pendant lighting, delivering both visual impact and effective illumination throughout the space. The combination of modern and industrial design elements helped create a distinctive interior while ensuring barber stations were well-lit for precision cutting and grooming services.
From initial design through to final installation and testing, all electrical works were completed to current regulations, providing a safe, reliable, and energy-efficient system. The completed project demonstrates our ability to deliver bespoke commercial electrical installations that balance functionality, aesthetics, and performance.
New Build Assisted Living Full MEP Installation
Location: Wimbledon, SW19
This new-build assisted living development in Wimbledon comprised 18 high-quality residential flats designed to provide safe, comfortable, and energy-efficient accommodation for residents.
Dynamic Engineering Group Ltd delivered the complete mechanical, electrical, plumbing, and ventilation package throughout the development, working closely with the main contractor to ensure all systems were installed to the highest standards. The project incorporated a range of sustainable technologies, including air source hot water cylinders and solar photovoltaic panels, helping to improve energy efficiency and reduce the building's environmental impact.
The installation also included two 800-litre water storage tanks, full ventilation systems, lift integrations, and Guardian safety systems throughout the building. Particular attention was given to resident safety and accessibility, with specialist features such as anti-ligature shower fittings and carefully coordinated MEP services designed specifically for an assisted living environment.
From first fix through to final commissioning, the project showcased our ability to deliver complex MEP installations that combine sustainability, compliance, and long-term reliability.
New Build Residential & Assisted Living Development Full MEP Installation
Location: West Norwood, SE27
This large-scale mixed residential development in West Norwood comprised 18 assisted living apartments alongside 33 residential apartments arranged across five floors, creating a modern and sustainable living environment for residents.
Dynamic Engineering Group Ltd delivered the complete mechanical, electrical, plumbing, and ventilation package throughout the development, working closely with the main contractor and project team to ensure all systems were installed to the highest standards. The project combined the specialist requirements of assisted living accommodation with the demands of a multi-storey residential development, requiring careful planning, coordination, and attention to detail throughout.
Specialist installations included Guardian systems, nurse call systems, access control, and anti-ligature fittings designed to support resident safety and wellbeing. Across the wider development, our works included full electrical and plumbing installations, ventilation systems, life safety systems, generator integration, and a combined 4,300-litre domestic and sprinkler water storage system providing both everyday water supply and fire protection.
The development also incorporated sustainable technologies, including air source hot water cylinders and solar photovoltaic panels, helping to improve energy efficiency and reduce the building's environmental impact.
From first fix through to final commissioning, the project showcased our ability to deliver complex MEP installations across multi-storey residential developments while maintaining quality, compliance, and long-term performance.
New Build Residential Development Shell & Core Electrical Installation
Location: Rotherhithe, SE16
This residential apartment development in Rotherhithe required a comprehensive shell and core electrical installation to provide the essential infrastructure supporting the building's long-term performance, safety, and reliability.
Dynamic Engineering Group Ltd delivered the complete shell and core electrical package, working closely with the main contractor and wider project team to ensure all systems were installed to the highest standards. The project involved the installation of electrical plant rooms, riser containment systems, landlord distribution boards, mains distribution infrastructure, and all associated lighting and power systems throughout the development.
Our scope also included the installation and coordination of the substation, LV panels, and Ryefield distribution equipment, forming the backbone of the building's electrical network. Due to the technical nature of the works, careful planning and coordination were required throughout the project to ensure seamless integration with other trades and compliance with all project specifications and regulatory requirements.
From initial infrastructure installation through to final testing and handover, the project demonstrated our ability to deliver complex electrical packages for large-scale residential developments while maintaining quality, safety, and reliability at every stage.
Address
Banstead, SM7
Opening Hours
Monday - Friday: 7:30am - 4:30pm
Saturday - Sunday: Closed
Social media